Column 1
|
Column 2
|
Proposed development
|
Qualifying criteria
|
1 Agriculture
|
(1) To
change the use of uncultivated or semi-natural land to use for an intensive
agricultural purpose.
|
The area of the
land exceeds 0.5 hectares.
|
(2) To
develop a water-management project for agriculture, including irrigation or
land drainage project.
|
The area of the
project exceeds 0.5 hectares.
|
(3) To
construct or install an intensive livestock installation.
|
The area of the
installation exceeds 0.5 hectares.
|
(4) To
develop or construct an installation to rear of fish.
|
The area of the
installation exceeds 0.5 hectares.
|
(5) To
construct, develop or install a building, or to change the use of a building
(in whole or in part), for the purpose of cultivation of plants of the genus Cannabis, or for the production of products
including any part of, or derivative from, plants of the genus Cannabis.
|
|
2 Extractive industry
|
(1) To
extract peat.
|
|
(2) To
carry out deep drilling, including, in particular –
(a) geothermal
drilling,
(b) drilling
for the storage of nuclear waste material,
(c) drilling
for water supplies,
but excluding drilling to investigate the
stability of the soil.
|
|
(3) To
extract minerals (other than metalliferous and energy-producing minerals)
including, in particular, marble, sand, gravel, shale, salt, phosphates and
potash.
|
|
(4) To
extract coal or lignite, whether by underground or open-cast mining.
|
|
(5) To
extract petroleum.
|
|
(6) To
extract natural gas.
|
|
(7) To
extract ores.
|
|
(8) To
extract bituminous shale.
|
|
(9) To
extract minerals (other than metalliferous and energy-producing minerals) by
open-cast mining.
|
|
(10) To
extract minerals by fluvial or marine dredging, except maintenance dredging.
|
|
(11) To
develop a surface industrial installation for the extraction of coal,
petroleum, natural gas or ores or bituminous shale.
|
|
(12) To
install a coke oven for the dry distillation of coal.
|
|
(13) To
construct an installation for the manufacture of cement.
|
|
3 Energy industry
|
(1) To
construct a power station or an installation for the production of
electricity, steam or hot water, not being a domestic scale solar panel or
wind turbine.
|
|
(2) To
construct an industrial installation –
(a) to
carry gas, steam or hot water; or
(b) to
transmit electrical energy by overhead cables.
|
|
(3) To
construct an installation for the surface storage of natural gas.
|
(1) The
area of any new building or structure exceeds 500 square metres.
(2) The
installation will be sited within 100 metres of a stream, pond or reservoir.
|
(4) To
store combustible gas underground.
|
(1) The
area of any new building or structure or of the storage area exceed 500
square metres.
(2) The
storage area will be sited within 100 metres of a stream, pond or reservoir.
|
(5) The
surface storage of fossil fuel.
|
(1) The
area of any new building or structure, or of the deposit exceed 500 square
metres.
(2) The
deposit will be sited within 100 metres of a stream, pond or reservoir.
|
(6) The
provision of an installation for the industrial briquetting of coal or
lignite.
|
|
(7) The
construction or change of use of an installation for the production or
enrichment of nuclear fuels.
|
|
(8) The
construction or change of use of an installation for the reprocessing of
irradiated nuclear fuels.
|
|
(9) The
construction or change of use of an installation for the collection or
processing of radioactive waste.
|
|
4 Production and
processing of metals
|
(1) The
construction of an ironworks or steelworks, including a foundry, forge,
drawing plant or rolling mill.
|
|
(2) The
construction or change of use of an installation for the production
(including smelting, refining, drawing and rolling) of non-ferrous metals,
other than precious metals.
|
|
(3) The
construction or change of use of an installation for the pressing, drawing or
stamping of large castings.
|
|
(4) The
construction or change of use of an installation for the surface treatment
and coating of metals.
|
|
(5) The
construction or change of use of an installation for boilermaking or
manufacturing reservoirs, tanks and other sheet-metal containers.
|
|
(6) The
construction or change of use of an installation for manufacturing or
assembling motor vehicles or manufacturing motor-vehicle engines.
|
|
(7) The
construction or change of use of an installation for use as a shipyard.
|
|
(8) The
construction or change of use of an installation for the construction or
repair of aircraft.
|
|
(9) The
construction or change of use of an installation for the manufacture of
railway equipment.
|
|
(10) The
construction or change of use of an installation for swaging by explosives.
|
|
(11) The
construction or change of use of an installation for roasting or sintering
metallic ores.
|
|
5 Glass making
|
The
construction or change of use of an installation for the manufacture of
glass.
|
|
6 Chemical industry
|
(1) The
construction or change of use of an installation for the treatment of
intermediate products and the production of chemicals.
|
|
(2) The
construction or change of use of an installation for the production of
pesticides or pharmaceutical products, paints or varnishes, elastomers or
peroxides.
|
|
(3) The
construction or change of use of an installation for the storage of petroleum
or petrochemical or chemical products.
|
|
7 Food industry
|
(1) The
construction or change of use of an installation for the manufacture of
vegetable or animal oils or fats.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(2) The
construction or change of use of an installation for the packing or canning
of animal products.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(3) The
construction or change of use of an installation for the manufacture of dairy
products.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(4) The
construction or change of use of an installation for brewing or malting.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(5) The
construction or change of use of an installation for confectionery or syrup
manufacture.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(6) The
construction or change of use of an installation to be used to slaughter
animals.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(7) The
construction or change of use of an installation to manufacture industrial
starch.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(8) The
construction or change of use of an installation for use as a fish-meal or
fish-oil factory.
|
The new floor area
of the installation exceeds 1000 square metres.
|
(9) The
construction or change of use of an installation for use as a sugar factory.
|
The new floor area
of the installation exceeds 1000 square metres.
|
8 Textile, leather, wood
and paper industries
|
(1) The
construction or change of use of an installation for use as a wool scouring,
degreasing or bleaching factory.
|
The area of new
floor space of the installation exceeds 1000 square metres.
|
(2) The
construction or change of use of an installation to manufacture fibre board,
particle board or plywood.
|
The area of new
floor space of the installation exceeds 1000 square metres.
|
(3) The
construction or change of use of an installation to manufacture pulp, paper
or board.
|
The area of new floor space of the installation exceeds 1000
square metres.
|
(4) The
construction or change of use of an installation for use as a fibre-dyeing
factory.
|
The area of the
floor space of the installation exceeds 1000 square metres.
|
(5) The
construction or change of use of an installation for use as a
cellulose-processing or production installation.
|
The area of new
floor space of the installation exceeds 1000 square metres.
|
9 Rubber industry
|
The
construction or change of use of an installation to manufacture or treat elastomer-based
products.
|
|
10 Infrastructure
projects
|
(1) The
carrying out of an industrial estate development project.
|
The area of the
development exceeds 0.5 hectares.
|
(2) The
carrying out of an urban development project, including the construction of
shopping centres, car parks, sports stadiums, leisure centres and multiplex
cinemas.
|
Floor area of the
buildings included in the project exceeds 10,000 square metres.
|
(3) The
installation of a cable-car.
|
|
(4) The
construction of a road.
|
The area of the road,
including any pavements, exceeds 0.5 hectares.
|
(5) The
construction of a harbour, including a fishing harbour.
|
|
(6) The
construction of an airport.
|
|
(7) The
canalisation or flood-relief works.
|
The area of the
canal and any auxiliary work exceeds 0.5 hectares.
|
(8) The
construction of a dam or any other installation designed to hold water or
store it on a long-term basis.
|
The area of the
dam or installation exceeds 0.5 hectares.
|
(9) The
construction of a tramway, elevated or underground railway, suspended line or
similar line.
|
|
(10) The
construction of an oil or gas pipeline installation.
|
|
(11) The
installation of a long-distance cable for the transmission of electricity.
|
|
(12) The
construction of a long-distance aqueduct.
|
|
(13) The construction
of a marina.
|
|
(14) The
construction of coastal works to combat erosion, (but not the maintenance and
reconstruction of such works).
|
|
(15) The
construction or placing of maritime works that are capable of altering the
coast by virtue of their construction or placement.
|
|
11 Other projects
|
(1) The
construction of a holiday village or hotel complex and associated
developments in a rural location.
|
The area of the
development exceeds 0.5 hectares.
|
(2) The
construction of a permanent racing or test track for cars or motor cycles.
|
|
(3) The
laying out of a golf course and the construction of any associated
development.
|
The area of the
course and any associated development exceeds 0.5 hectares.
|
(4) The
construction of an installation for the disposal or treatment of waste
(including waste from mines and quarries and vegetable waste).
|
|
(5) The
construction of a waste water treatment plant, including a treatment plant
that forms part of any other development.
|
The area of the
plant exceeds 0.5 hectares.
|
(6) The
change of use of land to use as a site for the deposit of sludge (but not
treated or pelleted sludge).
|
|
(7) The
change of use of land to use as a site for the storage of scrap metal.
|
The land is within
100 metres of a stream, pond or reservoir.
|
(8) The
installation of a test bench for engines, turbines or reactors.
|
The area of new floor space of the development exceeds 1000 square
metres.
|
(9) The
construction or change of use of an installation to manufacture artificial
mineral fibres.
|
The area of new
floor space of the development exceeds 1000 square metres.
|
(10) The
construction or change of use of an installation to manufacture, package,
load or place in cartridges gunpowder or other explosives.
|
The area of new
floor space of the development exceeds 1000 square metres.
|
(11) The
construction or change of use of an installation or the change of use of land
for use as a knackers’ yard.
|
The area of new
floor space of the knackers’ yard exceeds 1000 square metres.
|
(12) Any
development on land covered or, in the normal course of tides, from time to
time covered by sea water.
|
|
(13) The
reclamation of land from the sea.
|
|